Creating a Sign Program

   

The creation of a sign program involves seven steps. Whitney Veigas can be involved in all or some of the steps, depending upon the requirements of a specific project.

 

3 - Design Development

 

Download PDF

 

Feedback from the owner and architect are incorporated into the design of the sign program, and final sign type drawings are prepared. The design vocabulary drawings illustrate the precise graphic character of every sign type, and are submitted for review and approval by the owner and architect.

Sign schedule and location plan